"Samelandssenteret" (5 of 5)
Description
The complex has an open solution where all of the premises are connected via indoor passageways. At the same time, there is direct access to the individual areas from the outside. The public areas are located on the building's front side - facing the square - while the production areas and workshops are situated on the backside. This illustration is from Byggekunst 8/1990.